City of San Leandro Farrelly Pool Replacement
Year completed: 2021
In 2021 the City of San Leandro completed a major renovation, which included new facilities and repairs to the existing pool, and includes a heated seasonal pool with seven 25-yard lap lanes, changing areas, outdoor lockers, restroom, and shower facilities. It serves the community with aquatics programs that include swim lessons and lap swim.
ReScape Score
82



Address: 864 Dutton Ave, San Leandro, CA 94577
Project Owner/Developer: City of San Leandro
ReScape Rater: Sarah Gronquist
Landscape Size: 20,350 sq ft
Grounds Open To Public? Yes
ReScape Landscape Highlights
Photovoltaic panels provide 44% of the site's electrical power.
Underground rainwater cisterns collect hardscape runoff and return it slowly to the soil.
18.61 Tons of construction waste was diverted, with greenwaste reduction by up to 1.3 tons annually.
Saves 102,664 gallons of water per year and reduces greenhouse gas emissions by up to 4.8 tons of C02E over the life of the project.